Supreme SMW Composite Waterproofing Method
The Supreme SMW composite waterproofing method integrates fiberglass non-woven fabric into a rubber asphalt sheet that boasts outstanding cold resistance and elastic recovery. This method combines the sheet with a specially coated material that exhibits exceptional adhesiveness, produced in a factory setting, to create a unified product. At the site, a reinforcing coating waterproofing material is applied to the seams of the sheet. This approach allows anyone to perform rapid and uniform quality construction, making it an innovative waterproofing method.
Secured cold
resistance -20℃
Securing behavior traceability
Ensure excellent adhesion
Securing construction quality and economic feasibility
Secured cold resistance -20℃
Ensure excellent adhesion
Securing behavior traceability
Securing construction quality and economic feasibility
Materials used in Supreme SMW composite waterproofing method
Division | Materials used | Property |
Primary Waterproofing Layer | Asphalt impregnated nonwoven fabric or polyester non-woven fabric | improved physical performance, Integration with film waterproofing material, Waterproof layer protection possible |
Secondary waterproof layer | high viscosity adhesive | Satisfactory low-temperature bending performance even below -20℃ and excellent physical performance such as elongation |
Third waterproof layer | low viscosity adhesive | Excellent adhesion and elastic recovery at low temperature (5℃), excellent followability to background behavior |
※SIZE 3.0mm X 1.0M X 10M
※ Specifications other than the above can be changed and produced at the request of the consumer.
Supreme SMW composite
waterproofing method
Construction sequence
Diagram
01. Asphalt adhesive application
02. SMW sheet laying
03. Sheet joint application
04.Construction completed
SupremeENC
Leading the way with faith and technology
Supreme SMW composite waterproofing method
Construction sequence
Diagram
01. Asphalt adhesive application
02. SMW sheet laying
03. Sheet joint application
04.Construction completed