mobile background

Supreme Project management

Background of Introduction


With the increasing diversification and specialization of waterproofing construction, there is a growing need for effective and systematic management of construction projects. Construction sites are aiming for stable construction and minimization of defects through organized management systems.

In line with this trend, Supreme ENC has introduced a site management system to achieve efficient construction management and minimize defects based on field conditions such as work process, quality, and weather.

Background of Introduction

With the increasing diversification and specialization of waterproofing construction, there is a growing need for effective and systematic management of construction projects. Construction sites are aiming for stable construction and minimization of defects through organized management systems.

In line with this trend, Supreme ENC has introduced a site management system to achieve efficient construction management and minimize defects based on field conditions such as work process, quality, and weather.


Based on our long-standing experience that even with high-quality materials and construction methods, good results cannot be achieved without a well-organized site management system, Supreme ENC has developed its own site management system to achieve the following effects

Expected Outcome

Personnel Cost

Reduction

Construction Period

Reduction

Defect Rate

Reduction

To ensure accurate construction, workers receive training on construction methods through videos and quality manuals, and direct site management is conducted to reinforce proper execution.

To enhance construction efficiency and achieve shorter construction periods and labor cost savings, we offer customized maintenance measures and construction methods for each material, optimized for seasonal variations.


Summer Season:

  • Moisture content must be below 8% prior to construction.
  • Regular moisture content measurements are essential to ensure optimal conditions.

Winter Season:

  • If temperature is below 5°C, use fan heaters to maintain a suitable temperature for construction.
  • If temperature is below freezing, install fan heaters and tents to create a controlled environment for construction.

To ensure optimal waterproofing quality, we rigorously monitor and manage the following factors during construction

JOINT machine construction offers a high-precision and efficient solution for critical JOINT areas, ensuring optimal quality and preventing the waste of materials.

ex) JOINT machine construction ensures precise and consistent coating application, resulting in uniform thickness and width across the entire surface. This not only minimizes material waste but also allows for faster and more accurate construction, leading to superior results and optimized project timelines. 

To ensure optimal performance and quality of the coating, we implement a rigorous quality control system that includes direct supervision of all construction sites and the distribution of timers to each site. This ensures that the mixing time for coating materials is strictly adhered to, resulting in a consistent and high-quality application.

ex) To ensure the optimal performance and longevity of our coating systems, we employ a rigorous quality control process that includes the use of timers to precisely manage the mixing time of coating materials. This proactive approach prevents defects caused by insufficient mixing, resulting in a consistently high-quality application that meets our stringent standards. 

Our commitment to continuous improvement drives us to actively collect feedback from each construction site. This feedback is then analyzed to identify potential areas for improvement, which are promptly implemented in new projects. This proactive approach ensures that our construction practices continually evolve and improve, resulting in superior quality outcomes that meet our stringent standards.

ex ) The Joint Applicator is a product that was developed through multiple rounds of modifications and improvements based on feedback from field workers. 

Our rigorous site management system ensures the timely identification of defective construction areas. Upon identification, we promptly propose and implement appropriate repair and reinforcement methods to prevent defects from escalating. This proactive approach minimizes the risk of further damage and ensures the long-term durability and integrity of the construction project.

SupremeENC directly manages all construction sites, maintains construction logs, 

and continuously strives for quality improvement to minimize defects on site.

Supreme Site Management System


Construction pre

In construction

After construction

Delivery of technical data book

Watch the method video

Construction training in progress

number of workers and
Make sure you are familiar with 

the construction method

Areas with defective construction, 

pointed out areas
Repair, reinforcement proposals and consultations

Construction section and
Confirmation of concrete pouring time

Depending on season, climate, and site conditions

Proposal of health measures

To prevent the same phenomenon from occurring again in the future distribute it by listing it in the construction quality manual.

Reflecting the weather forecast

Construction schedule coordination

Confirmation of received materials and Check material storage status

※ Check the condition of background preparation, drying condition and pre-strengthening of weak areas

Material usage and

check stirring time

※ In cases where regular visits are difficult, receive real-time photos and videos of the construction status from the work site manager to prevent problems in advance.

※ In case of defect


1st: Identify and analyze the cause through field logs, etc.
2nd: Establish a direction for improvement by deriving a solution to the problem with the factory QC and technical team
3rd: Presentation and discussion of countermeasures


Supreme field management system

We systematically manage waterproofing construction sites.

Supreme Site 

Management System


Before Construction

Delivery of technical data book

Watch the method video

Construction training in progress

Construction section and
Confirmation of concrete pouring time

Reflecting the weather forecast

Construction schedule coordination

Confirmation of received materials and Check material storage status

※ Check the condition of background preparation, drying condition and pre-strengthening of weak areas

In construction

number of workers and
Make sure you are familiar with 

the construction method

Depending on season, climate, and site conditions

Proposal of health measures

Material usage and

check stirring time

※ In cases where regular visits are difficult, receive real-time photos and videos of the construction status from the work site manager to prevent problems in advance.

After construction

Areas with defective construction, 

pointed out areas
Repair, reinforcement proposals and consultations

To prevent the same phenomenon from occurring again in the future distribute it by listing it in the construction quality manual.

※ In case of defect


1st: Identify and analyze the cause through field logs, etc.
2nd: Establish a direction for improvement by deriving a solution to the problem with the factory QC and technical team
3rd: Presentation and discussion of countermeasures

Contact : 02-525-8631

SupremeENC 

Leading the way with faith and technology